Apr 12, 2014

Eee-Vee, Pee-Vee: An EV Owner's Realization that Solar Makes Perfect Sense in Seattle


Eee-Vee

Why did you buy an electric car? Or, why would you buy an EV? Is it the ultra-ECO Nissan LEAF? Or are you into the totally chic Tesla Model S? Whatever your reasons, there is no hiding the fact that there are some very real monetary motivations to going EV too!

One's decision to ultimately buy an EV also means that there will be an investment. An investment of time is necessary to fully understand and realize the financial benefits of the purchase. Here's the short version:

The U.S. federal government subsidizes EV sales by providing owners an income tax rebate on their overall tax burden during the year the EV was purchased. It's an awesome fringe benefit, but the buyer should do some tax prep to be sure that the full $7500 rebate will come back at tax time. This federal incentive is a use-it-or-lose-it affair. Otherwise, leasing is an excellent option, wherein the $7500 tax benefit applies immediately at the point-of-sale with a resulting low, low lease rate for the new EV driver.

In Washington state, where my family lives, EV adoption is also incentivized by forgoing state sales tax on the purchase of any new electric vehicle. Again, though, one needs to research this perk as some plug-in vehicles qualify (Nissan LEAF), and others do not (Chevy Volt).

The longer that an EV driver can keep the car in service, substantial long-term financial advantages will be realized too. With little to no maintenance costs to keep the vehicle on the road, EV drivers can benefit from the fantastic financial return for money not spent on their car. Windshield washer fluid and a new in-cabin air filter once a year is about it.

EV  =  NMG (No More Gas!)

Lastly, there is so much money not spent on "fuel." At 15,000 miles driven a year, an average medium-sized ICE (internal combustion engine) car costs about $0.15 per mile in gas. As compared to a Nissan LEAF, for example, that costs less than $0.03 per mile in electricity.



Pee-Vee
Made in Washington, Itek Energy Solar Panels

Last summer, after trading in our Mazda CX-9 for a second Nissan LEAF, I started researching incentivized energy options. The next bang-for-the-buck "going green" play was the installation of photovoltaics (PVs) on our roof. Our new PV system will actually be more financially beneficial than our EVs!

The easiest way to explain the cash benefits is to show it on a simplified graph:



The above graph represents after-tax incentives and rebates. This is important to clarify because the cash rebates and incentives are provided at different times in that first year of a PV system being installed. Also, these incentives are a mixture of federal, state (Washington), and local (Snohomish County PUD) programs. Others' cash benefits may differ, depending on location.

For those living in Washington and receiving electric service through the Snohomish County PUD, this is the breakdown:

Year One: About $12,000 Cash 

  • Federal Tax Rebate: 30% tax rebate*
  • State Incentive: Solar production cash incentive of $0.54 per kWh generated**
  • Local Incentive: Snohomish County PUD cash incentive of $2500***
Years Two - Six: About $3,100 Cash Annually

  • State Incentive: Solar production cash incentive of $0.54 per kWh generated

Now to explain all of those asterisk! 

*The federal tax rebate is used at tax time for 30% of the PV installation cost. In our case, the $21,050 project will allow for a tax rebate of just over $6,300 on our 2014 federal income taxes. And unlike the EV federal tax credit, if one does not have the tax burden to get the full rebate amount, the 30% rebate can be stretched over multiple years so that the whole amount is realized.

**Washington state is incentivizing PV solar production. The base incentive rate is $0.15 per kWh produced. This is if the solar panels and inverter(s) are made outside of Washington state. If Made in Washington panels and inverter(s) are used on the PV project, the state will reward those who buy local with a $0.54 per kWh cash incentive. 

Estimating what the annual solar production will be requires the use of a sophisticated program (Not my brain, silly people!). We can expect the first year solar production to total about 5,800 kWh as measured by AC net output with the System Advisor Model. Our state production incentive will be about $3,100 annually, but our first year payout will be a bit less due to the PV installation happening partway into the calendar year.

The Washington state production incentive is accrued annually as a cash incentive. However, the state production incentive program will expire on June 30, 2020. Thus, the state production incentive in year seven is half of the preceding years.

***Snohomish County PUD incentivizes its electricity costumers to install PV by providing a $2500 cash incentive. This is a $500 per kW installed incentive, up to $2500 total. Since our PV system has a DC rating of 5.4 kW (solar production measured at the solar panels), we'll get the full $2500.

We do have a 10-year loan for the PV system, therefore will have a negative net cashflow (approx. -$2,500/year) for years 8-10. However, once the system is paid off, we'll benefit from lower utility bills for as long as we live in the house. And when it comes time to sell our house, we'll benefit from increased property value from the PV system.

There it is...Eee-Vee, Pee-Vee, and one of the true pleasures of EV ownership: becoming savvy about all of the financial opportunities for going green.

Apr 9, 2014

EV Scenic Byways: Coulee Corridor

Have you ever heard of the Missoula Floods? Up until a month ago, I hadn't either.

It was during a conversation with my school's two sixth grade science teachers last month that I first heard of the floods and got excited to explore eastern Washington's Coulee Corridor. Stretching from Omak to Othello is a region of channeled scablands and coulees (steep-sided ravines and gorges) formed from massive Ice Age floods some 15,000 years ago. An ice dam at Lake Missoula broke dozens of times, resulting in a series of catastrophic floods that carved out a large region of eastern Washington.

Dry Falls: When water flowed, it was five times the width of Niagara Falls!


Getting excited for a road trip is easy. Going on a road trip that is a first-ever documented journey in an all-electric Nissan LEAF is the tough part. For example, the only EV plug on a 175-mile stretch from Ellensburg to Spokane, Washington is in Moses Lake, at 68 miles from Ellensburg. We would not be driving as far east as Spokane this time, but there still was a need for charging solutions to cover the hundreds of miles that we'd be touring on this EVenture along the Coulee Corridor.

From western Washington, I decided to take a northern route, driving across Stevens Pass to the town of Pateros, 55 miles north of Wenatchee. A partnership between Plug-In North Central Washington and the Pateros Lakeshore Inn resulted in a high amperage Level 2 charging unit in this town, at the base of the Cascade Mountain range, within the past year. "Level 2" charging will provide most new Nissan LEAFs a complete charge in about 3-4 hours.

There was much fun to be had while charging in Pateros--what a beautiful area!


After departing Pateros, the only charging opportunities that we'd have access to for the next two days would be 50-amp service at RV campgrounds. Our first night's stay in the Coulee Corridor was near the Grand Coulee Dam, at an RV campground called the Grand Coulee RV Park.

EV Fear Factor


At about the halfway point from Pateros to Grand Coulee, I pulled our LEAF over to take in the vastness. Our previous charge was way back along the Cascade Range (background of the above picture). Seeing the mountains disappearing in the rearview mirror was a bit disheartening!

Beyond the impressiveness and fear factor of the views, this section of the Columbia Plateau has other "discoveries" that took our minds off of the charging situation. Massive boulders, known as glacial erratics, randomly scatter the landscape on the plateau; another indicator of the flooding that took place in the region thousands of years ago.

I knew that we could make the 55-mile drive from Pateros to Grand Coulee. However, no amount of planning and reassurance will prevent EV drivers from feeling occasional wisps of terror when driving in an EV Badlands area, where there is nowhere to plug into for dozens of miles all around. To make a comparison: It was like we left Pateros in a Toyota Prius with a gallon and a half of gas in the tank.

RV Park Charging


The owner of the Grand Coulee RV Park was very receptive to discussing pricing options for future EVs. While EV drivers typically prefer to pay for a Level 2 charge by the kWh (1,000 watts in an hour's time), metered RV campground receptacles are uncommon in the Pacific Northwest due to inexpensive electricity rates. Conversely, in California, many RV campgrounds have meters at every 50-amp receptacle.

Grand Coulee RV Park accepted a very reasonable alternative: A flat $5.00 EV charging fee for up to four hours of use at one of the bountiful 50-amp RV hookups. If travelers want to stay the night, the RV park will include the EV charging for free--just pay the nightly $20.00 fee for tent camping.

Electric Remote Controlled Helicopters


The owner of the Grand Coulee RV Park was excited to talk shop...about all kinds of EVs! It turned out that he is an electric RC helicopter enthusiast. We spent some time talking about battery technology and body frame materials. Like EVs, the RC helicopters are powered with lithium batteries. And like new EVs (read: BMW's i3), the RC helicopters had a carbon fiber frame.

With battery capacity/density continuing to increase and costs decreasing, we'll undoubtedly continue to see battery technology displace and/or replace the established energy sources in all aspects of our lives...our hobbies...our transportation.

Grand Coulee Dam: Enough Power Generated to Charge a Nissan LEAF more than 875 Million Times in a Year!!!


Truly a structure that must be seen to be appreciated, the immensity of Grand Coulee Dam cannot be easily described. Let me try to do it some justice, courtesy of Wikipedia:

  • The Grand Coulee Dam is the largest power station in the U.S. and 7th largest in the world.
  • The third power plant (added in 1974), alone, produces twice the electricity as Hoover Dam.
  • The dam has enough concrete (12 million cubic yards) to build a road from Seattle to Miami.


Steamboat Rock



Our second day of the EV road trip was filled with some of the greatest and grandest sites to be seen along the Coulee Corridor.

The first stop was at Steamboat Rock State Park. One of the benefits of going on a road trip during the off-season is that, by definition, there is hardly anybody else there. I took full advantage of this by plugging into one of the many unoccupied RV 50-amp service hook-ups at Steamboat Rock State Park (and later in the day at Sun Lakes-Dry Falls State Park). With the car charging, we had an excuse to take our time and enjoy the sites. And enjoy we did!

My daughter. Oh, and the largest waterfall in history: Dry Falls.


The drive in between Steamboat Rock State Park and Sun Lakes-Dry Falls State Park was actually one of the highlights of the day for me...the driver. This goes back to it being the off-season for tourism and there being nobody to share the road with. For 50 miles, from Steamboat Rock State Park to Ephrata, I knew that I could use as much of the battery charge as I pleased (remember, there was plenty of charging opportunities at the state parks). So, ECO mode was turned off and Steve's "Fun Mode" switched on.

Driving along Banks Lake, with 700-ft. basalt cliffs on either side, my senses tuned into a singularity. I only focused on the rush of wind as the car zipped along. There was no engine noise or exhaust rumble coming from our LEAF, which in turn, made the wind noise the one focus. It was glorious!

Bad daddy moment at Lenore Lake Caves--that's our son at the far left of the picture, wondering freely.


Along the shores of Lenore Lake are a series of seven caves accessible via a 1.5 mile roundtrip hike. For our six-year-old daughter, the rock climbing and scrambling was no problem. For our two-year-old son, the terrain was impassible in many areas. So what is a prudent dad to do? I put him on my shoulders, of course!

A little backstory: I am 6'11" tall.

Hiking and scrambling along with a 35-lb. child on my shoulders effectively made my center of gravity somewhere between my collar bone and chin. It was a miracle of all miracles that I did not fall to my death, along with my son, on the Lenore Lake Caves hike.

Lenore Lake Caves

Here is another view of the Lenore Lake Caves. These caves formed during the Missoula Floods when the igneous rock layers gouged away with the tremendous power of water.

Oops! I almost ran out of juice. Here, trickle charging in Quincy, WA.


At the end of our second day, I had planned on us camping and over-night charging in Quincy. When we pulled into town in the early evening hours, I still had plenty of charge remaining in our LEAF. I wanted to charge at a local golf course, Colockum Ridge Golf Course.

Before leaving on the trip, I had attempted to contact public relations folks at the Port of Quincy, who own/manage Colockum Ridge Golf Course. My inquiries with the Port of Quincy were never returned. I was not worried, though, because I figured that I could establish phone contact with the golf course manager, or even somebody in the pro shop, while on the trip.

Unfortunately, for two days, I had no cell service. In this age of The World is Flat, I was unable to get cell service or a data connection in hundreds of miles of driving. We were very much traveling in civilization, though...driving through many towns along the way. However in an era of being connected at any time and anywhere, I felt completely isolated from the civilized world.

Colockum Ridge Golf Course


After driving an additional five miles from downtown Quincy, we arrived at Colockum Ridge Golf Course. I immediately saw that the camping situation would not work because there were no restrooms accessible after hours. We returned to Quincy, as I remembered seeing a sign for RV camping earlier. Within moments of pulling into the "campground," I realized that we would need to find an alternative.

Those ten miles of extra driving out to the golf course, and back, had hammered my range, though. So we pulled in at a local grocery store and trickle charged for an hour.

Ultimately, we ended back at Colockum Ridge Golf Course. It would be a great spot to charge an EV while playing golf, but overnight tent camping was not ideal.



The Feathers


The Feathers are basalt columns located between Vantage and The Gorge Amphitheater. This is seemingly a popular location for amateur rock climbers, as there are numerous safety hooks bolted into the rocks throughout.

Rock climbers in training.


Our EV road trip's last destination was at the Wild Horse Wind Farm. The wind farm is Puget Sound Energy's second largest in Washington, and capable of generating 273 megawatts of electricity every year. The site also has one of the Northwest's largest solar power arrays, with more than 2,700 solar panels that are capable of producing 500 kW of electricity.

Wild Horse Renewable Energy Center


The purpose of this trip was to see some of the spectacular sights along the Coulee Corridor with my daughter and son. It was after leaving the Wild Horse Renewable Energy Center that I thought how fitting for the Coulee Corridor to be bookended with two clean power generating sources, with the Grand Coulee Dam at the north end and the Wild Horse Wind and Solar Farm at the southeast corner. And what better way to experience Coulee Corridor than to be in an all-electric Nissan LEAF!